Jaipur Metro map
The route map of the Jaipur Metro Pink Line — all 11 stations from Mansarovar to Badi Chaupar, elevated then underground. Download the PDF or explore the diagram.
Information updated: October 2026
Network route map
A clear schematic of the Pink Line — all 11 stations from Mansarovar in the west to Badi Chaupar in the old city, showing which stations are elevated and which run underground.
Lines and legend
Pink LineMansarovar ↔ Badi Chaupar
11 stations · operatingOrange LineTodi Mod ↔ Prahaladpura
Phase 2 · approved April 2026InterchangesRailway Station connects to Indian Railways (Jaipur Junction); Sindhi Camp to the central bus stand.
Pink Line
Orange Line — approved, not yet built
Jaipur Metro Phase 2 (Todi Mod ↔ Prahaladpura) was approved in April 2026 and is to be built by RMRCL, with a September 2031 target. No start of works has been confirmed.
Service status
Jaipur Metro status
Service status · based on the published timetable
P✓
Pink Line · Mansarovar – Badi Chaupar
Within service hours
Within service hoursOutside service hours
🚇
Before every trip, check the Metro statusSave this page to your favourites: timetable, fares and the official notices we publish are here, each with the date we checked it.